guest house or detached ADU on a Wine Country vineyard parcel

ADU Builder and Contractor in Temecula Wine Country

Wine Country parcels along Rancho California Road, De Portola Road, and Calle Contento run multiple acres, which makes them the largest ADU sites in the Temecula area.

They also carry the most complicated permit path, because some sit inside city limits and some fall under Riverside County. Getting that wrong costs months. License B-842038.

Call (951) 551-6165
Free · No Obligation

Request a site visit

Service
Contact
Address
35
Years In Construction
22
Years Building In Temecula
350+
Completed Projects
B-842038
California License
JURISDICTION

City or County Decides Everything

This is the first question on a Wine Country project and most contractors skip it.

Two jurisdictions, one road

Parcels along the same stretch of road can fall under different authorities. City parcels permit through Temecula Building and Safety under Municipal Code Chapter 17.23. County parcels permit through Riverside County, under the Temecula Valley Wine Country Community Plan and county zoning.

The rules differ in ways that matter

Setbacks, allowed structures, agricultural zoning overlays, and fee schedules are not the same. A design drawn to city standards can fail county review outright. We confirm your jurisdiction before drawing anything.

Agricultural zoning adds conditions

Parcels zoned for citrus, vineyard, or equestrian use carry conditions on what you build and where. A second dwelling on an agricultural parcel is usually allowed, but the siting rules are stricter than on a residential lot.

UTILITIES

Septic and Well Capacity

Most Wine Country parcels run on septic, and many run on a well. Both decide whether your project pencils.

Septic capacity comes before design

Adding a dwelling unit means proving your existing system handles the additional load. That review runs through Riverside County Environmental Health. If the system needs expansion or replacement, that cost exceeds anything you will spend on finishes. We test this first.

Bedroom count is a lever you control

Septic systems are sized by bedroom count. Building a one bedroom unit instead of a two bedroom sometimes keeps you inside existing capacity. That single decision saves more money than any material choice on the project.

Well capacity needs verifying

A second dwelling draws more water. Where your parcel runs on a well rather than Rancho California Water District service, capacity gets confirmed before design.

WHAT FITS

What You Can Build Here

Detached ADUs and guest houses

Up to 1,200 square feet detached under state ADU law, with four foot side and rear setbacks. On a five acre parcel that unit sits far enough from the main house to function as a genuinely separate residence.

See our full ADU services.

Barn and outbuilding conversions

Many of these properties already carry a barn, shop, or equipment building. Where the foundation and roof are sound, converting one skips the most expensive part of a new build.

See our garage conversion work.

Room additions

Lot size is never the constraint here, so room additions are straightforward. The constraint is utility capacity and jurisdiction.

DISTANCE

The Cost of Distance

Big parcels carry a specific cost profile that a tract lot quote will not reflect.

Utility trench length

A unit 150 feet from the main house needs 150 feet of trench for water, sewer or septic line, and electrical. On rock or hardpan that trench is a serious line item. We measure the run on the first visit.

Access for equipment and material

A long unpaved drive affects how concrete gets delivered and whether equipment reaches the pad. This is labor cost, and it belongs in the original number.

Panel capacity

Older properties here often run limited service. A full dwelling unit usually requires an upgrade. Known cost, not a surprise, as long as someone checks the panel first.

REMODELING

Remodeling Wine Country Properties

Housing here ranges from 1970s ranch homes to newer custom builds. Older properties usually have original bathrooms with step-over tubs, small vanities, and supply lines past their service life. We take the room to the studs, check the plumbing during demolition, and tell you what needs replacing before we close walls.

COSTS

Costs in Wine Country

See our full ADU cost breakdown.

These are estimated ranges. They cover construction and standard finishes. They exclude site plan, permit fees, school fees, and engineering consultants, plus any soils report, grading, trenching, retaining walls, HOA fees, or utility connection fees your property requires.

Call For A Real Number
Detached ADU, 499 sq ft one bedroomEstimated Cost$225,000
Detached ADU, 749 sq ft two bedroomEstimated Cost$290,000
Barn or outbuilding conversionEstimated CostCustom quote
Septic upgrade if requiredEstimated CostProject specific
Primary bathroomEstimated Cost$35,000
Hallway bathroomEstimated Cost$20,000
Walk-in shower conversionEstimated Cost$10,000
Room addition, 500 sq ftEstimated Cost$175,000

Estimated costs. Every property is different, so your final price depends on your lot, design, and finish selections. We give you a firm number after a free site visit.

CREDENTIALS

Licensing and Credentials

Spencer has worked in construction since 1990 and has built in Temecula since 2004. More than 350 completed projects. Bonded and insured, with certificates provided before work starts.

California general contractor license

B-842038, active and in good standing.

Experience

Spencer has worked in construction since 1990 and has built in the Temecula Valley since 2004. More than 350 completed projects.

Bonded and insured

General liability and workers compensation certificates provided before work starts.

Licensed subcontractors only

Every subcontractor on your job is licensed and insured.

Verify any California contractor license, including ours, through the Contractors State License Board. Check it before you hire anyone.

REVIEWS

What Temecula Valley homeowners say

More than 350 completed projects in Southern California and the Temecula Valley, and a five star rating across Google, Yelp and Houzz.

Google · August 2025
As a plumbing contractor I've worked with a lot of builders over the past 25 years and the truly exceptional ones are few and far between. Woollard Construction is one of the best. We routinely go back to homes they've either remodeled or performed additions to years later for general plumbing maintenance or repairs and the homeowners still speak glowingly of their experience with Woollard construction even decades later. There is only ONE home builder I regularly recommend and that is Woollard Construction.
Jack Havlicheck
Plumbing contractor, 25 years in the trade
Google · May 2025
Everything about our experience with Woollard Construction was amazing!! Spencer was fantastic!! He was punctual, professional and great at communicating where we were in every step of the process. Our ADU is beautiful and we are so happy with how everything turned out.
Holly Ostroske
ADU build
Google · May 2026
We received several quotes before going with him, and his price was extremely competitive, especially considering the quality of his work. I was concerned about having the bathroom be an unusable mess during the remodel, but Spencer left it spotless each time he finished for the day. He communicated clearly every step of the way and was prompt and thorough.
Lena Abella-Saunders
Bathtub to step-in shower conversion

It depends on your exact address. Parcels along the same road can differ. We confirm your jurisdiction before any design work starts, because the rules and the fees are not the same.

Usually yes. State ADU law applies broadly, though agricultural zoning adds conditions on siting and use. We check your parcel's zoning and overlays on the first visit.

Sometimes. The county reviews whether your existing system handles the added load. Sizing the unit as a one bedroom rather than a two bedroom sometimes avoids the upgrade entirely.

As far as your setbacks and your budget allow. The limiting factor is trench distance for utilities, not a rule. We measure and price the run honestly.

FREE CONSULTATION

Get a free Wine Country site visit

We confirm your jurisdiction, check septic and well capacity, and tell you what fits before you spend on design. Call (951) 551-6165.

HoursMon to Fri 7am to 5pm, Sat 8am to 1pm
Free · No Obligation

Request a site visit

Service
Contact
Address

Woollard Construction. License B-842038. Serving Temecula Wine Country and all of Temecula.